OASIS Information
For purposes of Section 3.4.1 of the Lucky Corridor LGIP, the term “regulatory limitations” means a federal, state, Tribal, or local law that makes it practically infeasible to obtain Site Control within the time frame required in Transmission Owner’s LGIP.
Don Carlos Wind Farm Final System Impact Study
Negotiated Rate Filing
Mora Line Transmission Project MMA-1 Report
Mora Line Transmission Project MMA-2 Report
Mora Line Transmission Project MMA-4 Report
Don Carlos Wind Farm Final System Impact Study
Mora Transmission Line Project Facilities Study Report 11-16-17
Mora Transmission Line Project 11-16-17 PNMOASIS
TI-19-0411 FacilitiesStudy 8-26-20
Lucky Corridor Tracking
Making an Interconnection Request
When an entity requests a new interconnection to the Transmission System, that entity must submit a request in writing. Such a request should be sent to:Director Transmission Portfolio Management, Planning and Project Controls
contactus@luckycorridorproject.com
Ameren Services Company
P.O. Box 66149, MC 410
St. Louis, MO 63133-6149
Telephone No. (575) 201-7434
Large Generation Interconnection requests (greater than 20 MW) should follow the procedures outlined under Attachment N of the OATT
Small Generation Interconnection requests (facilities no larger than 20 MW) should follow the procedures outlined under Attachment O of the OATT